Related Articles
Wind Farm Update: Bigger Turbines Prompt Council Study
Wind Farm Update: Bigger Turbines Prompt Council Study By Jack Ellis Source: Ventus Draft ESR, Figure 7.3, page 53 Over two years ago Ventus Energy Inc. proposed six 400-foot high wind turbines centred on the open fields of the Robitaille Farm site in the 19th Concession. They set up [more]
PAUZE DUMP UPDATE
PAUZE DUMP UPDATE Background: The Pauze Dump was the site of a massive disposal of industrial and other types of chemical waste from 1966 – 1980. In 1981, the dumpsite and nearby illegal dumping in and around the area just east of Perkinsfield and Simcoe County Road 9 was discovered to [more]
Municipal Elections – Tiny Township – Mark Your Calendar
Municipal Elections – Tiny Township – Mark Your Calendar ARE YOU ELIGIBLE TO BE ON THE VOTERS’ LIST? You are eligible to vote if: (1) a resident of the Township or (2) the owner of land in the Township or the owner’s “spouse” (as defined by the Act). Of course, all [more]
